|
Zeeland
Michigan Integrated Architecture
Finalist
2003 Business Week - Architectural Record Awards
2001

- qMarketPlace’s
construction cost of $89/SF is 33% below Herman Miller’s typical
reference points
- qDocumented
operational cost savings 41% below Herman Miller’s other facilities.
- qOrganizational
and worker effectiveness increased about 20 percent
- Squrpassed
sustainability goals to achieve LEED gold certification.
- qFilled
with “the new luxuries for the 21st Century: natural light, fresh air
and space.” (design Architect, Mike Corby, AIA)
- qSite
able to retain a 100-year storm event.
|